Wes requested 3 quotes from Excavation Experts in Kings Park
trench with services for secondary dwelling. Overall length 41 meters. Final 19 meters will be 600mm + deep for electrical, final 14 meters will have town gas 38 meters will have town water line to street for connection to new Sydney water meter and entire length will have phone and RG6 to street. Require new separate gas meter and new separate electrical meter on main board. Current main board on primary dwelling appears to have 10mm feed from street
Trenching for the phone line
Need trenching done for the phone line
Trenching + Cementing
Trench 10m x 5m approx 1m deep in parts and not over
EXCAVATION: FOOTING DUG, LEVELING FOR TURFING
FOOTING DUG, LEVELING WORK TO PREPARE FOR TURFING, EXCAVATION LEVELING FOR...
Excavation, back yard needs to be leveled. Medium to large job.
back yard needs to be leveled. Rock and soil. Need teseting. Medium to large...