Akos requested 3 quotes from Excavation Experts in Ormeau
Earth-works is required for a 9m x 4m front yard area to rip the old grass & top soil up and remove from site. Leveling the ground with new soil might also be required.
Dingo to excavate backyard approx 9mtsl x 1mt into slope for sleeper retaining wall
Excavation needed for rear of yard. mini excavator would be best suited....
EXCAVATOR FOR NEW HOUSE
EXCAVATOR FOR NEW HOUSE
Level dirt and spread top soil. Approx 200 square mts
Bobcat to level the dirt. 200 square mts. Spreading top soil.
Excavator to get sand removed and taken away 3 cubic metres asap
excavator to get sand removed and taken away 3 cubic metres