Stump holes dug

Russell requested 3 quotes from Excavation Experts in Sunbury

  Need stump holes dug some just need clearing with Auger roughly 300mm. Require excavator with hammer as 4 of the holes hit rock at surface need to go 450mm deep with these holes.

Quote Details

  • Suburb Sunbury, VIC 3429
  • Specialisation Post Hole Digging
  • Date Listed 19 Feb 2015 - 10:25 am

Similar Quote Requests

10 post holes dug 750 deep with rock in ground
holes are marked out have come across honeycomb rock some 150 down other...

Post hole digging for retaining wall
I need 5 holes to be dug for retaining wall, the holes need to be 1 metre deep.

Need 3 holes dug and soil moved
I need 3 holes dug for retaining wall. Holes will be approx 400 x 1200. Area...

BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...