Soil removal from back and front yards

Felix requested 3 quotes from Excavation Experts in Vermont

  We need to lower the level of our both front yard and back yard by about 10-15cm to allow for a pave to be built. Front Area is about 4m x 4m, back area is about 5mx4m. please note that there is Approx 2m wide access to back yard.

Excavation Experts that Responded

Confined Cut Earth Moving

GT Excavations & Landscaping

Quote Details

  • Suburb Vermont, VIC 3133
  • Specialisation Earth-Moving
  • Date Listed 11 Dec 2012 - 1:09 am

Similar Quote Requests

Soil cartiage - soil removal - trucks required
soil needs removing. I need to get around 50 cubic metres of soil removed...

Bob cat required
Need a bob cat for a rubbish tidy up. To include concrete slab break up &...

Back yard excavated
Our back yard of just less than 200sqm needs to be cleared and leveled....

Clear and level yard
clear and level a yard to be ready for paving / decking and landscaping....