Jimmy requested 2 quotes from Excavation Experts in Yarraville
Need small excavator to finish footings in basement hole
15 post holes dug 350 mm wide on slightly wet top soil. tracks prob needed
15 post holes 350mm wide dug. top soil is slightly wet so machine would need...
Post hole digger required to dig 32 in ground concrete foundation pier holes
Post hole digger required to dig 32 in ground concrete foundation pier holes...
Digging stump holes
Want to dig about 70 stump holes of size 400 x 400 x 900 depth.
Require digging stump holes
I need to dig :
1. About 70 stump holes of size 400 x 400 x 900 depth.
2. May...