Require site scraped and prepared for commencement of building works,

Chris requested 3 quotes from Excavation Experts in Bayswater

  require site scraped and prepared for commencement of building works, also require digging of footings and drainage Dual occupancy development. Registered tradesman required as owner builder project. Retaining existing dwelling and adding unit at rear to be finished

Quote Details

  • Suburb Bayswater, VIC 3153
  • Specialisation Boring
  • Date Listed 27 Jan 2016 - 11:33 pm

Similar Quote Requests

Excavation - Trench for 3 phase power
After an excavator to dig a trench Trench for supply cable for 3 phase power

BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...

SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA

EXCAVATE EXISTING CONCRETE AND EARTH
APPROX 75 SQUARE METRES