Lee requested 2 quotes from Excavation Experts in Ivanhoe
Level and excavate part of rear and both side yards approx 100-150mm, for conrete paths and extended driveway.
dig approx 40m trench for pipes, and backfill after pipes dropped in.
move 10 cubic of soil from front to rear yard and pile.
move 6 cubic of crush rock from front yard to rear and spread & pile were required.
minor digging in front yard required.
note 2m high access restriction through double and singl garage roller doors.