JOHN requested 3 quotes from Excavation Experts in Keilor East
I have about 3 cubic metres of soil I would like removed from my front yard. The soil is in a heap & is a leftover from my paving excavation. Access to it is via my driveway.
On Track Excavations (Vic)
To fill a whole in garden
To fill whole/cavity in side garden, Site report has been done by an engineer...
BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...
SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA
EXCAVATE EXISTING CONCRETE AND EARTH
APPROX 75 SQUARE METRES