Alex requested 3 quotes from Excavation Experts in Mudgeeraba
After the builder scrapes the 452 sq.m. plot in mudgeeraba there will be approx 40 cu.m. of soil/fill to be removed. the material can be positioned at the front of the plot to enable easier access from the road in front of the site.
can you advise if a truck could make say 2 or 3 trips to dispose of this material.
thank you
Moreton Horticulture Pty Ltd
Excavation- Rock retaining wall and driveway and parking bay prep.
We need a rock retaining wall erected as well as some general earth moving...
EXCAVATOR FOR NEW HOUSE
EXCAVATOR FOR NEW HOUSE
Level dirt and spread top soil. Approx 200 square mts
Bobcat to level the dirt. 200 square mts. Spreading top soil.
Excavator to get sand removed and taken away 3 cubic metres asap
excavator to get sand removed and taken away 3 cubic metres