Amar requested 3 quotes from Excavation Experts in Ingleburn
Remove 30,000 ltr inground fibre glass pool and fill the space with soil, concrete base and topped with a rubber foam mat(similar to the ones in child care gardens).
Removing the Inground Pool
I want to remove my Ingorund Pool
EXCAVATION: FOOTING DUG, LEVELING FOR TURFING
FOOTING DUG, LEVELING WORK TO PREPARE FOR TURFING, EXCAVATION LEVELING FOR...
Excavation, back yard needs to be leveled. Medium to large job.
back yard needs to be leveled. Rock and soil. Need teseting. Medium to large...
Approx 70sqm earth moved and lossened for residentrial
Earth moved and loosened for back and front of residential. approx 70sqm