Mary requested 3 quotes from Excavation Experts in Bayswater North
(a) External ground levels are recommended to be excavated to the level of the subfloor
(or lower if possible) and sloped to fall away from the residence to grade to the
adjacent reserve, or to surface collection pits for the stormwater;Following excavations and re-shaping of the external ground, an impervious path (preferably
concrete or heavy duty polythene covered by lilydale topping) should be constructed directly
adjacent to the perimeter walls. The path should be a minimum width of one meter and
sloped to cross fall away from the residence.
Confined Cut Earth Moving
Mini Digger Earthworks
Monstella Excavations
Dirt to be remved aprox 6mts x 3mtrs
easy to get to i hve a area aprox 5meters x 3meters i have rotory hoed it...
Small backyard levelled and top soil spread
Need backyard levelled and top soil spread ready for lawn
Excavation
excavate and remove soil (mud at the moment) from front yard in preparation...
Excavation & removal of concrete slab, pull out tree stumps & level area
area of concrete approx 11 x 4 meters from old garage and end of driveway to...