Post holes for new building

Lee requested 3 quotes from Excavation Experts in Camberwell South

  I'm looking for someone to come in a dig 9 post holes this Saturday or as soon as possible after Saturday in preparation for steel posts going in soon after.
The post holes need o be 1.4 meters deep and 450mm diameter.
The site has already been excavated and all top soil removed… so all digging will be in clay. It will not be possible to get a dingo digger in. Approx. path with in 900mm with a 1.4 metre drop on 1 side.

Excavation Experts that Responded

G Civil Pty Ltd

Landscaping and Brick Paving by Peter Breeden

Quote Details

  • Suburb Camberwell South, VIC 3124
  • Specialisation Post Hole Digging
  • Date Listed 9 May 2017 - 6:13 pm

Similar Quote Requests

Drilling holes for a retaining wall in rocky soil and rock
Drilling ro a retaining wall difficult access

Cash job to dig soft soil for retaining wall 300X300X14 metres
labourer needed to do some digging

BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...

SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA