Mick requested 3 quotes from Excavation Experts in Connewarre
8 post holes 300-400mm wide x 600mm deep
Kelgar Minidiggers and Garden Services
On Track Excavations (Vic)
17 post holes dug
We need 17 holes dug for posts. 10 or so will need to be 750mm deep and the...
BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...
SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA
EXCAVATE EXISTING CONCRETE AND EARTH
APPROX 75 SQUARE METRES