Owen requested 3 quotes from Excavation Experts in Traralgon East
New house just finished construction. We have soil stockpiled in the front yard from excavation after installation of driveway. Require this soil to be transported to the backyard, approximately 100m. Currently the backyard has two distinct levels where fill was placed during the house construction, probably a difference of 400mm at the steepest point. Require this to be levelled out to a smaller grade.
Easy access as no fences are up yet. Quick job for a bobcat.