Natalie requested 3 quotes from Excavation Experts in Heidelberg
Our backyard has a slope and we need it levelled and the soil removed. The soil to be removed is contaminated with building rubble from recent renovations. The area is about 60sqm. We would also like approx 12 post holes dug for a low (600 high) retaining wall that will need to be installed after the levelling. Access to the backyard for equipment is available via our neighbours driveway, which runs beside our backyard, we just need to remove the fence panels for access.
Kelgar Minidiggers and Garden Services
Contractors Construction Group
Block of land requires cut and fill
My block of land at University Hills Bundoora have slope around 3.62-4.00M2...
Block of land requires cut and fill
Hi, I would like a quote for excavating and level.
the site is on a slope...
Excavation & site leveling for new home
We are building a new home, and would like a quote for excavating and...
Dig and Remove dirt/sand/clay from the backyard
I had an above ground pool on the higher level floor, which i removed and now...