Already a Service Central user? Log in here
Post hole rock drilling for retaining walls
Excavation: Post Hole Digging
in Yarra Glen, VIC 3775
16 February 2013
Approx 15 post holes required for retaining wall, surface is mudstone. deepest hole is 1500mm and shallowest hole is 500mm deep. Limited hight access of 2300mm limited width for drilling area is...
Back yard scraped and flat with bob cat
Excavation: Site-Cuts
in Yarra Glen, VIC 3775
29 August 2011
Bob cat needed to scrape back yard level. And move pile of dirt from front yard to back yard. Days work on bobcat .
Requires 16 post holes dug in the backyard to so a retaining wall can be put in place.
Excavation: Earth-Moving
in Yarra Glen, VIC 3775
11 March 2008
Requires 16 post holes dug in the backyard to so a retaining wall can be put in place.urgent