Already a Service Central user? Log in here
Excavation
Excavation: Conduit Installation
in Truganina, VIC 3029
17 April 2019
10m electrical underground 600mm deep approx
Boulders removed
Excavation: Earth-Moving
in Truganina, VIC 3029
15 March 2017
New 400 sq m block of land where other people have dumped large boulders, unused concrete, soil etc. Needs to be removed.
Post holes
Excavation: Post Hole Digging
in Truganina, VIC 3029
12 September 2015
I need 7 holes dug up approx 30 cm wide and 80 cm deep to plant tress . If someone owns a post hole borer / digger . . Excess soil / clay removal included in the cost . Please quote price .
Excavation of Front and Rear Back Yard
Excavation: Earth-Moving
in Truganina, VIC 3029
12 November 2013
Excavation required by Bobcat to scrap and level both front and back yards of new house. Some soil to be dumped as well. Ready to go.
Trenching and conduit
Excavation: Trenching
in Truganina, VIC 3029
26 February 2013
trenching and laying conduit for nbn from house to telstra pit
Excavtion/removal of soil
Excavation: Soil Removal
in Truganina, VIC 3029
14 May 2012
excavation required for nature strip, leveling of excess soil, sand and removal of 4 railway sleepers. nature strip approximately 15mt by 1.5mt
Backyard leveling 10x 14 mtr
Excavation: Earth-Moving
in Truganina, VIC 3029
6 February 2012
my backyard needs levelling 10 by 14 meters location truganina
Levelling excavation of nature strip
Excavation: Earth-Moving
in Truganina, VIC 3029
12 December 2011
levelling of 18.5mt by 1.5mt nature strip removal excess sand soil and pebbles approx 1 to 2 cubic mts of debris
Clear ,Level and remove rubbish for front and back yard
Excavation: Earth-Moving
in Truganina, VIC 3029
21 September 2011
Looking to get quotes on how much to level dirt/gravel in front and back yard of house using dingo or similar that can fit through garage gate . All together about 150-160sqms.
Level the backyard & sideyard
Excavation: Earth-Moving
in Truganina, VIC 3029
28 May 2010
I need to get my backyard & sideyard levelled. Backyard is 8 meters lenght and 10 meters wide. Sideyard is 8 meters wide and 20 meters in length. I have some dirt that can be used, but more dirt...
Need man with bobcat or mini excavator for front crossover
Excavation: Earth-Moving
in Truganina, VIC 3029
18 June 2009
Im puting in a crossover and need it dug out,and need quoate for another bigger job
Dig out and level front garden and dispose of soil
Excavation: Earth-Moving
in Truganina, VIC 3029
14 January 2008
dig out about an inch of soil and level front garden. Also require soil to be disposed of please.