Already a Service Central user? Log in here
Rock removal from ground in building site
Excavation: Earth-Moving
in Maribyrnong, VIC 3032
11 October 2012
rock removal from ground in building site
Digging stump holes
Excavation: Post Hole Digging
in Maribyrnong, VIC 3032
6 February 2012
Want to dig about 70 stump holes of size 400 x 400 x 900 depth.
Require digging stump holes
Excavation: Post Hole Digging
in Maribyrnong, VIC 3032
6 February 2012
I need to dig : 1. About 70 stump holes of size 400 x 400 x 900 depth. 2. May be (optional) dig hole for sewer drain of 2.4m depth and 4m long.
Trenches dug for foundations of front fence, approx. 19 metres and 60cm deep, wide 40cm
Excavation: Trenching
in Maribyrnong, VIC 3032
19 February 2008
Trenches dug for the foundations of front fence