Removal soil and digging pathway
Excavation: Soil Removal
in Footscray West, VIC 3012
30 March 2016
need soil removed from front yard approx 4 sq cubic meters
Removal soil and digging pathway
Excavation: Soil Removal
in Footscray West, VIC 3012
3 March 2016
need soil removed from front yard and digging path
Excavation trenching
Excavation: Site-Cuts
in Footscray West, VIC 3012
10 June 2015
Excavator for small coventional concrete slab trenching. 300 and mud bucket and maybe rock breaker. Easy access ready now. Footscray area.
Post hole digger required to dig 32 in ground concrete foundation pier holes
Excavation: Post Hole Digging
in Footscray West, VIC 3012
21 April 2015
Post hole digger required to dig 32 in ground concrete foundation pier holes 1500mm deep [or to rock] 300 round. Ready now easy access corner block. Can pay cash. John
Concreting in backyar for a new garage. Need site dugged out and soil taken away.
Excavation: Soil Removal
in Footscray West, VIC 3012
24 October 2014
Concreting in backyar for a new garage. Need site dugged out and soil taken away. Need help with the digging and have soil removed from site.
Excavation
Excavation: Compacting
in Footscray West, VIC 3012
30 August 2013
Proposed Construction of 10 Apartment Units and 1 Shop Unit
Garden need leveling
Excavation: Earth-Moving
in Footscray West, VIC 3012
24 February 2010
My front and to some extent back yards need 10-20cm of soil removed. there is limited accesss and would require a dingo or something of the sort. The main area is about 4m*10m
Excavation of backyard for garage and deck
Excavation: Earth-Moving
in Footscray West, VIC 3012
18 January 2009
I plan to buide a garage (40 sq mts) and deck (44 sq mts). For deck, dirt will need to be removed. The block slopes so depth of excavation reguired starts about 20cm near house to about 40 or...
Aarea to be leveled and a concrete slab removed
Excavation: Earth-Moving
in Footscray West, VIC 3012
9 April 2006
concrete slab and area under a pagola to be excavated and leveled approx. 30 - 35sq m