Jacob requested 2 quotes from Excavation Experts in Brighton East
A 30m footing is required for the fence. The footing needs to be 600mm deep. The digger will need rubber tracks as it will need to operate on the footpath. full plans and soil report is available if required.
NEEDS TRENCH DUG
NEEDS TRENCH DUG
TRENCHING AND BORING
TRENCHING AND BORING
Trench dug for sewerage pipe under house
sewerage pipe connection for ensuite needs to be lower than ground level....
BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...