Harvey requested 2 quotes from Excavation Experts in Templestowe
The foothpath is 2 meters wide and there's some landscaping structure on 0.5m on either side of the foothpath. The conduit needs to run under the foothpath and concrete structure totalling 3 meters. The job will take place on private property and 1100 has been contacted ; no asset owners have anything in the way. 2 conduits needs to be installed 22mm x 2.
Excavation for retaining wall
We are constructing a retaining wall and need an excavator to dig out for...
BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...
SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA
EXCAVATE EXISTING CONCRETE AND EARTH
APPROX 75 SQUARE METRES