Robert requested 3 quotes from Excavation Experts in Cardiff
concrete pool with pebble decking surround approx 3 ft deep shallow and 6 ft deep at the other end. the earth from the excavation was used to level the back yard adjacent to the pool which is now covered by concrete slabs. there is driveway access but with a tight corner to negotiate. concern about council requirements for the removal of pools. prefer work to meet council's regs.