David requested 3 quotes from Excavation Experts in Point Cook
Need around 50mm of soil removed as it contains still some builders concrete etc soil must be disposed of. Full access from the empty block next door. We have two garden beds installed which may limit the size of the machine to be used. Pic attached.
On Track Excavations (Vic)
BOBCAT TO LEVEL BACK YARD
BOBCAT TO LEVEL BACKYARD
Front yard cleared soil needs removing 2-3 inches below current level
I want my front yard cleared, only small yard & i have recieved advice a...
TO CLEAR AND REMOVE DIRT TO PREPARE FOR A DRIVEWAY
TO CLEAR AND REMOVE DIRT TO PREPARE FOR A DRIVEWAY
Bobcat opertor for a shed 7 mtrs x4.5mtrs and dirt cleared out
bobcat operator for a shed 7mtrsx4.5mtrs