Michael requested 3 quotes from Excavation Experts in Officer
Scrape down of 60m2 of nature strip - approx 30 meters by 1.8-2m wide. Couple of trees to be careful of.
Already had 50mm taken off the top 12 months ago in prep for seed. Never got around to it. Need general tidy up so another 50mm approx taken off.
Also 3-5m approx of clay fill to be removed - already in pile at top end of nature strip.
EARTH MOVING -DINGO HIRE
EARTHMOVING -DINGO HIRE
Level yard
Remove 2-3 inches soil to level yard,use soil to level another area.All in...
Cut new driveway
We need a 75m x 3m gravel driveway cut so that trucks have access to our...
Driveway needs fixing
Long driveway, gravel. good base but needs reshaping as tracks worn and ? an...