Nik requested 3 quotes from Excavation Experts in Red Hill
Steep slope between house and fence needs to be excavated to a uniform degree ready for planting.
Site is dirt and shale, 20-30m long & 3-4m wide.
Removal of soil, debris and old gate posts
excavation, removal of soil, old gateposts, debris etc
EXCAVATOR FOR NEW HOUSE
EXCAVATOR FOR NEW HOUSE
Level dirt and spread top soil. Approx 200 square mts
Bobcat to level the dirt. 200 square mts. Spreading top soil.
Excavator to get sand removed and taken away 3 cubic metres asap
excavator to get sand removed and taken away 3 cubic metres