Aaron requested 3 quotes from Excavation Experts in Roseville
Excavation and post hole digging for a deck. Area is 11m x 4m. Excavate approx 300mm and dig up to 15 post holes (500mm-600mm).
Spoil can be kept on site at rear of property.
Access via driveway and drive through garage (2000mm clearance).
Fence post hole digging x 16 posts busy roadside
14 to 16 post holes required to be dug and posts cemented in place for 36m...
EXCAVATION: FOOTING DUG, LEVELING FOR TURFING
FOOTING DUG, LEVELING WORK TO PREPARE FOR TURFING, EXCAVATION LEVELING FOR...
Excavation, back yard needs to be leveled. Medium to large job.
back yard needs to be leveled. Rock and soil. Need teseting. Medium to large...
Approx 70sqm earth moved and lossened for residentrial
Earth moved and loosened for back and front of residential. approx 70sqm