Excavation & leveling of soil for new lawn.

Connie requested 3 quotes from Excavation Experts in Malvern

  `Already surveyed area of 145sq metres requires a "dingo" to level soil and move to surrounding garden beds. Back yard at end of driveway, to pass between a garage wall and house wall area of 1,098cm width,which is a metre in length. Maximum depth to be excavated is 15cm.

Excavation Experts that Responded

V-TRAC

DB Landscape Construction Pty Ltd

Quote Details

  • Suburb Malvern, VIC 3144
  • Specialisation Earth-Moving
  • Date Listed 9 Jan 2012 - 4:40 pm

Similar Quote Requests

Earthmover/ bobcat
Need front yard levelled and excess dirt taken away. I have pulled fence down...

Excavation dirt to be take away
need a 6 meater truck or bigger and bobcat to take dirt away for a couple of...

Excavation bobcat and truck to take out a couple of driveways
Clean fill to take out of a couple driveways