Excavating? Moving clay soil from backyard to front and also from front

Jack requested 3 quotes from Excavation Experts in Williams Landing Point Cook

  Need to remove clay soil from the back and then fill with top soil. The same will need to be done for the front yard. Access to the backyard is only 900mm.
Backyard is roughly 14 x 5 and will need to remove about 30cm in clay soil

Front yard is roughly 10m x 4 and will need to remove about 20cm in clay soil

Also willing to just hire a mini loader and do it myself.

Quote Details

  • Suburb Williams Landing Point Cook, VIC 3027
  • Specialisation Trenching
  • Date Listed 29 Nov 2010 - 11:07 pm

Similar Quote Requests

Trench dug, 22m for irrigation pipes
i need a 22m trench dug for irrigation pipes

Trench dug, 22m for irrigation pipes
i need a 22m trench dug for irrigation pipes, approx 15cm deep and minimum width

Telephone Trenching
Moving into a newly build house and require trenching for a new telstra phone...

Excavation needed for foundation to build a fence.
We need to excavate 28.5m X 600mm deep X 400mm wide. Must be someone who is...