Duncan requested 2 quotes from Excavation Experts in Maidstone
Front & backyards have been left in a bumpy condition fafter the building of a new house.
TASK 1. Excavate backyard (approx 15.8m wide x 9.7m length) by i) removing approx 30mm of earth and disposing of the earth & ii) level the backyard so it has a slight lean downwards from the back of the house downwards to the rear of the property
TASK 2. Excavate front yard (approx 12.4m wide x 4.5m length) by i) removing approx 30mm of earth & then disposing of it
All up approx. 190sqm of land to excavate
Blacrete Constructions Pty Ltd
Menzworks (Melb) Pty Ltd
Repair pot holes with cold asphalt
Need to have loose cold asphalt placed and compacted in pot holes and...
Aarea to be leveled and a concrete slab removed
concrete slab and area under a pagola to be excavated and leveled
approx. 30...
Garden need leveling
My front and to some extent back yards need 10-20cm of soil removed. there...
Excavation of backyard for garage and deck
I plan to buide a garage (40 sq mts) and deck (44 sq mts).
For deck, dirt...