Excavate and complete works to create an underground cellar in a backyard.

George requested 3 quotes from Excavation Experts in Hawthorn East

  bore 30 piers at 1.250 cc half on 2 boundaries and 5.450 deep for retaining wall. 26m3 of soil class P. Then dig and remove a further 137.5m3 of soil to prepare concrete work for a cellar basement, shotcrete walls waterproofed on outside. .45 by .45 capping beam perimeter.

Excavation Experts that Responded

One Stop Maintenance Services Pty Ltd - DNC

O'BRIEN PLANT HIRE PTY LTD

Quote Details

  • Suburb Hawthorn East, VIC 3123
  • Specialisation Boring
  • Date Listed 7 Jan 2013 - 8:13 pm

Similar Quote Requests

Install elec pit on naturestrip - boring work
boring work - install elec pit

Bore a small hole 5m horizontally beneath a reinforced concrete driveway
Bore a 1 to 2 inch hole for a length of 5M under a reinforced concrete...

Screw piles
Screw piers for concrete pool

BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...