Alija requested 3 quotes from Excavation Experts in Eumemmerring
Remove 3-4 m3 of garden rock and some bricks. Level and prepare driveway for concreting
Casey Earthworks
2-3m high, leveling of backyard, remove soil
remove soil form backyard,
- leveling of backyard
Remove/level approx 8 x 12mts access at side of house 1.5mt wide
-
- Our backyard approx 8x12 needs the top level removed and leveled out,...
Bob Cat Work
I require a bob cat and operator for scraping my block of land around my...
Excavation work
I have approx 200 sq meters of soil that I need to remove and level. The soil...