Greg requested 2 quotes from Excavation Experts in Nudgee
Dingo to dig post holes for fence in Nudgee. 32 metres approx 16 holes
PB Earthworks
16 x 500mm deep post holes in back yard for ground level deck.
16 x 500mm deep post holes in back yard for ground level deck.
Dig holes...
Need 18 post holes done along a fence line.
Post holes required for retaining wall.
EXCAVATOR FOR NEW HOUSE
EXCAVATOR FOR NEW HOUSE
Level dirt and spread top soil. Approx 200 square mts
Bobcat to level the dirt. 200 square mts. Spreading top soil.