Sergio requested 2 quotes from Excavation Experts in Ryde
I need to digg an absorption trench of 12mtrs long by approx 600 wide, plus and pit hole of 600x600.The house has a drive through garage for easy access.
Max height 2.4 mtrs
MULTITASKIT PTY LTD
Escavation of footings
escavation of footings and trenches for proposed extension.max 1.7m access...
EXCAVATION: FOOTING DUG, LEVELING FOR TURFING
FOOTING DUG, LEVELING WORK TO PREPARE FOR TURFING, EXCAVATION LEVELING FOR...
Excavation, back yard needs to be leveled. Medium to large job.
back yard needs to be leveled. Rock and soil. Need teseting. Medium to large...
Approx 70sqm earth moved and lossened for residentrial
Earth moved and loosened for back and front of residential. approx 70sqm