Cut/fill level pad for carport, needs drills for 10 post holes

Paul requested 2 quotes from Excavation Experts in Greenbank

  excavation, cut and fill cut a level pad for a carport above ground rainwater tank, also needs drills post holes.

Excavation Experts that Responded

TRENCHES R US

Quote Details

  • Suburb Greenbank, QLD 4124
  • Specialisation Earth-Moving
  • Date Listed 21 Nov 2007 - 4:24 pm

Similar Quote Requests

Req crane truck
Req crane truck.8 tonne or 20tonne

Dam wall reconstruction
Our dam wall has broken as there was no overflow in place. We would like the...

Excavation of plants from around dam
our dam needs excess dense foliage removed from around edges. excavator will...

Bobcat - Spread dirt and roadbase
i need somebody with a bobcat who can level my driveway. it consists of two...