Concrete (not re-enforced) needs pulling up & removed. Soil to be leveled.

Richard requested 2 quotes from Excavation Experts in Pascoe Vale

  I have pulled down an old garage & shed which has been removed from the property. The concrete that was underneath (not re-enforced) needs to be pulled up & taken away. The area of concrete is approx 67m2 & 2 inches thick. I need soil levelled after the concrete is removed. There is easy access down our driveway. A truck could fit.

Quote Details

  • Suburb Pascoe Vale, VIC 3044
  • Specialisation Earth-Moving
  • Date Listed 14 Sep 2009 - 9:34 pm

Similar Quote Requests

Removal of earth mound and partial excavation ready for concrete driveway
In the front yard I have a mound of clean fill that is about 8 - 10 cubic...

Excavation and removal of dirt
Take away approx. 10m3 - 12m3 of (clean fill) dirt from front garden plus...

Earthmoving/Excavation
Single storey home extension. Need site vegatation and some soil scrapped and...

Excavation
Hire a dingo with operator for approx 2-3 hours hire for this Saturday in...