Boris requested 3 quotes from Excavation Experts in Greenvale
approx 25-30 sq mtrs leveled down 100mm in preparation for concreting. Disposal of 3 - 4 cu mt. Straight forward job would be done in 3 hours max 4 hours.
GOKOOL Demolition & Construction
TALEB TRANSPORT PTY LTD
GNM Plumbing & Drainage
Rock removal from building site
hi
we are building a house in craigieburn. so far there has been 15 cubmic...
Excess removal of soil
excess removal of soil(clay) from the backyard and levelling the surface.
Mini Dingo Hire for frontyard leveling and tipping of soil and rock
Mini Dingo Hire for frontyard leveling and tipping of soil and rock
Stone removal
Small part of the backyard with stone, need to remove stones