Michael requested 2 quotes from Excavation Experts in Pennant Hills
Hi,
We need 2 holes dug for footings for an extension to a deck. Holes will need to be approximately 500Lx500Wx550D.
Site is sloping, soil type is predominantly clay with some slate/shale/rocks.
DA has been approved, awaiting on final CC approval, which should be any time now.
Would like job to be done as soon as CC is issued.
Successful applicant may be asked to also complete the concreting (after council inspection of holes) and/or additional work on the deck as needed.
24 holes, 400 dia, 500 deep, in sandstone
Work along boundary with good access
EXCAVATION: FOOTING DUG, LEVELING FOR TURFING
FOOTING DUG, LEVELING WORK TO PREPARE FOR TURFING, EXCAVATION LEVELING FOR...
Excavation, back yard needs to be leveled. Medium to large job.
back yard needs to be leveled. Rock and soil. Need teseting. Medium to large...
Approx 70sqm earth moved and lossened for residentrial
Earth moved and loosened for back and front of residential. approx 70sqm