STEPHEN requested 2 quotes from Excavation Experts in Noble Park
10 METRE LONG OF TRENCHING 600DEEP AND 100 WIDE
Drain Fix
8METRE LONG TRENCH TO DIG
8METRE LONG TRENCH TO DIG
BOBCAT TO REMOVE DIRT FROM BACKYARD AND FRONTYARD
BOBCAT REQUIRED TO REMOVE DIRT FROM BACK YARD TO INSTALL RETAINING WALL AND...
SITE CUT FOR SHED AND FLATTENING SITE
SITE TO BE CUT FOR SHED AND FLATTENING O GROUND FOR HORSE TRAINING AREA
EXCAVATE EXISTING CONCRETE AND EARTH
APPROX 75 SQUARE METRES