Andrei Stewart requested 3 quotes from Hire Suppliers in Oakleigh South
Turn and level approx 12m x 8m yard.
Remove approx 5m x 6m crushed stone drive and replace with soil. Approx 4\\
Menzworks (Melb) Pty Ltd
Bobcat hire to flatten out land end remove building materials
bobcat to flatten out land and to remove building materials.
TO LEVEL UNEVEN SECTIONS IN BACKYARD DRIVER REQUIR
BOB CAT HIRE TO LEVEL UN EVEN SECTIONS IN BACK YARD WOULD LIKE DRIVER AS WELL
Preparation for decking
Require 900 bobcat to prepare yard for decking. Yard is on a slope and access...
BOBCAT / EXCAVATOR
We need a 5000 x 600 wide x 2000 deep trench dug to enable an existing...