Roderick requested 3 quotes from Hire Suppliers in Brunswick East
Remove and dump hard rubbish about 4sqm
Remove and dump concrete slab 50-55sqm 8-10 cm deep
Fill excavated area from concrete and level.
Fill and level with crushed rock/concrete to be prepared for laying a slab 3m by 4m.
Fill rest with soil.
Backyard Excavation
Excavate and clear concrete and dirt from backyard. Drill post holes....
Dingo or kanga
Removing soil and levelling for concreting. Placing soil into skip. Depending...
REQUIRE CONTRACTOR AND BACKHOE
REQUIRE BOBCAT WITH BACKHOE AND A CONTRACTOR AS WELL FOR TOMORROW IF POSSIBLE
Clear contrete paving, garden beds in preparation for pool i
I need to clear a portion of my backyard in preparation for installing an...