Kent requested 2 quotes from Electricians in Taringa
Need to upgrade switchboard to 3 phase etc to accomodate proposed new ducted airconditioning system of 20-25kw
JCK Electrical Contractors Pty Ltd
Zeal Data & Electrical
Fitting a timer switch to the hot water system in metre box
Supply and fit a 15amp timer to the hot water switch in metre box
Electrician needed to relocate power box/switchboard.
Electrician needed to relocate power box/switchboard.
Check/setup meter box for fitting of off-peak meter for hot water.
I have been informed by Ergon that an electrician must check/setup meter box...
Switchboard replacement
my current switchboard still contains ceramic fuses which blow several times...