Alan requested 3 quotes from Electricians in Cashmere
I require 3 phase underground (trench by owner) to allow 32 amps per phase (10mm - 4 cables) to shed 50 metres from existing swbd which has 3 phase to it already. There is plenty of space inside swbd.
Speedy Electrical
JCK Electrical Contractors Pty Ltd
Supply install new fluro lighting & powrepoints new built veranda and single garage
supply install new fluro lighting and powrepoints for new built veranda and...
Pool pump needs to be connected to tariff 33
May require new swicthboard as nil space for additional meter in current one
Supply and install ceiling fan in bedroom
install a ceiling fan, in main bedroom
3 ceiling fans fitted + outdoor lights installed
3 ceiling fans fitted + outdoor lights installed