Remove overhead pwrline & install underground, 4 wires,3 phase, 240v,55metres, grade 3 lic req'd

Claudio requested 3 quotes from Electricians in Dural

  Remove overhead power lines and install underground.
- 4 wires 3 phase 240v 100a/phase about 55 metres. . reconnect to substation one power pole to be removed.
-