Claudio requested 3 quotes from Electricians in Dural
					  Remove overhead power lines and install underground.
 - 4 wires 3 phase 240v 100a/phase about 55 metres. . reconnect to substation  one power pole to be removed.
 -
				
Innovative Constructions
RTG Electrical Pty Ltd
	Electrical work (mainly installing lights),powerpoints.
	1.  install two outdoor lights.
2.  move a couple powerpoints lower on the...
	Electricity supply to building site 
	supply power pole and connect mains to it - supply a builders power board
	Outdoor lighting installed.10-15 approx.
	Outdoor lighting need to be installed.10-15 approx.
	IXL Tastic 4 in 1 Replacment 
	Old unit needs replacing. Changing the bulbs didn't work, So I pulled the...