Shao requested 3 quotes from Electricians in Ultimo
Could you please help with giving a rough quotation described below the best I can:
1. Roughly 4 electricians 2 weeks of work in Sydney.
2. The work involves fiber cabling and copper cabling for 24 more cabinets worth of devices on top of existing premises.
3. I'll come up with the current address and network carrier soon.
Install fibre optic cabling into office
Install new 65m CAT 5 tie cable from MDF. Run cable on existing cable tray...
Fiber Cable needs to be run from 1 rack to another at a datacentre
We have a fiber connection at the Telstra Rack 1 rack in our datacentre in...
Running 10 OM4/OM5 fibres (20 LC terminations) in single bedroom apartment
I need 10 fibres patched from one central location fanned out to 10 ports...
INSTALLATION OF SECOND PHONE LINE
SECOND PHONE LINE TO BE INSTALLED