Paul requested 3 quotes from Electricians in Hallam
A new kitchen is being installed over Easter into an existing house. The old kitchen will be demolished and 5 new powerpoints are required to be installed and an oven may require hard wiring. The walls are all plastered and two powerpoints have external walls. This job needs to be done on Friday 14 or Saturday 15 April
Bwd Aircon and Electrical
Hot Wire Electrics
Melbourne Electrical Specialists
SPA & SPA LIGHTS WIRED + AN EXTERNAL POWERPOINT
N/A
Rewire phone cables for NBN
Remove all splitters and phone points but one for NBN for premesis. Looking...
Electrical work
Kitchen renovated - range hood connected, oven connected and power points...
Down lights installed through out house
Remove existing lights and install down lights through out house