Mark requested 3 quotes from Electricians in Kellyville Ridge
Instructions given by AGL are as follows
• The issue with this site is there are the 3 meters at bottom of board with a service fuse mounted between them, relocating these fuses for a meter exchange is outside the scope of work.
• These would have to be relocated to provide the free space required as per below when the existing meters are removed at time if meter exchange. Note: meter wiring to be long enough for poly phase meter installation.
• The 4 meters would be removed and one MK10D poly phase meter would be installed.
• MK10D – h = 290, w = 172, d = 94 plus 20mm all round space.
We can provide a photo on request