Sam requested 2 quotes from Electricians in Hoppers Crossing
Install residual current device (safety switch) and circuit breakers.
Job can be started on or after 30th june 2008, but must be completed by 4th july 2008. Please Do not quote if you cant fit into this time frame. Thankyou.
A.B Electrics
Jatar Electrical
WORK WITH THE SAFETY SWITCH
WORK WITH THE SAFETY SWITCH
Safety switch tripping - no power to appliance - all lights ok
safety switch tripping - no power to appliances
Safety switch with 4 circuits , 2x16A power, 1x8A light & 1x20A stove
Install safety switch as above
Electrical safety switch has been blown needing replacement or repair.urgent
electrical safety switch has been blown needing replacement or repair