Stephen requested 3 quotes from Electricians in Cambridge Gardens
Quote to supply and install metering for 3kw solar system.
3 phase Meter box cramped, may have to replace off peak meter and switch with combined or fit another box.integral supply.
Rangehood Eurolec circuit board replacement
Circuit board on rangehood has blown and needs a replacement board. Eurolec...
INSTALLATION OF SECOND PHONE LINE
SECOND PHONE LINE TO BE INSTALLED
TELEPHONE LINE TO BE INSTALLED
CABLE NEEDS REPLACING
REMOVE ELECTRICITY
REMOVE SERVICE FROM GARAGE POSSIBILITY OF NEW POWER POINT