Electrician - mount new point of attachment and hang cables.

Tom requested 3 quotes from Electricians in Mascot

  Mount double riser for new point of attachment and rehang cabling for existing 3-phase connection. Single storey house in Mascot with easy access. Job needs to be done before this Friday 22-08-14.

A new L-shaped double riser needs to be installed onto rafters (30 degree pitch on roof, 400mm spacing between rafters, rafters 47mm thick). One of the galvanised bovara units or similar is what is needed. Cables need to be rehung from the current point of attachment to this new one. No new wiring or new cabling is needed, its all there in perfect condition, it just needs the new double riser bracket mounted and cables rehung onto it - thats it, nothing more. The existing cabling is only a year old, the rafters are perfect and there is more than enough length between current point of attachment and meter to do the job.

No need to remove current bracket etc, I will do that when I put the roof tiles back in. The eave boards are already removed, rafter exposed, its any easy job. I don't care if you are a level 2 electrician or not, it needs to be done to a high standard and within the week. Its a 45 minute job at most.

Electricians that Responded

Powerlink Electrical

Advanced Electrical Services Group Pty Ltd

ABC Electric Services

Quote Details

  • Suburb Mascot, NSW 2020
  • Specialisation New Electrical Installations
  • Date Listed 17 Aug 2014 - 1:50 pm

Similar Quote Requests

Various jobs install x2 phone lines additional adsol tv arial,install lights
Varous jobs, as below add 2 phone lines & addtional adsl connection boost...

Install 10 new hallogen lights in store
Install 10 new lights (halogen) in store

INSTALLATION OF SECOND PHONE LINE
SECOND PHONE LINE TO BE INSTALLED

TELEPHONE LINE TO BE INSTALLED
CABLE NEEDS REPLACING