Electrical

Sarah requested 2 quotes from Electricians in Altona Meadows

  As part of kitchen renovation: Initial disconnection of electrical outlets in kitchen (preferred date 31st August), then installation of new and previous power points and appliances (oven, range-hood, and dishwasher, aiming for 18th September). Also considering the installation of down lights in cabinet above stove next to range-hood.

Electricians that Responded

Envirolec Solutions P/L

Good Connections Electrical Contracting

Quote Details

  • Suburb Altona Meadows, VIC 3028
  • Specialisation Electrical Renovations
  • Date Listed 23 Aug 2018 - 5:58 pm

Similar Quote Requests

Relocate meter box from front door to blind side of house
Need the meter box moved and the switch board moved to inside the house.

REMOVING CEILING FANS AND INSTALLING LIGHTS
INSTALLING EXTERIOR LIGHTS, TV ANTENNA POINTS INSTALLED, INSTALLING HEATER...

Run power to shed
MCB already installed at meterboard. run = 20m inside house then 5m overhead...

Install 10 down lights
remove old lighting fixtures and install down lights/dimmers. - lights will...